{"autoplay":"true","autoplay_speed":"8000","speed":"1000","arrows":"true","dots":"false","loop":"true","nav_slide_column":5,"rtl":"false"}
{"autoplay":"true","autoplay_speed":"8000","speed":"1000","arrows":"true","dots":"false","loop":"true","nav_slide_column":5,"rtl":"false"}

DETAILS

LocationOntario, California, United States
ClientCity of Ontario
Size346 acres (Overall), 130 acres (Phase 1)

Dating back to the late 1800s, Ontario, California, has been an ideal destination for agriculture, boasting orange, peach, lemon, and walnut groves. With an economy now based in manufacturing, access to an international airport, and proximity to Los Angeles, Ontario’s population is predicted to double by 2035. In response to the growing community, Ontario Grand Park serves as an anchor for a developing part of the city, spanning over 340 acres and stretching a full mile longer than New York’s Central Park.

Drawing inspiration from the native flora and agrarian heritage, the Ontario Great Park Master Plan establishes a flexible framework to be realized over decades, responding to population growth. A tall canopy forest delineates the park’s perimeter, extending the canopy coverage from the neighboring streets. This network of much-needed shade frames the meadows and gardens within. A central arroyo serves as the drainage backbone for the park. A network of trails, including a major artery for bikes and pedestrians and smaller meandering paths, produces miles of ground to explore. As the surrounding neighborhoods grow, program elements can be added to the framework, as passive meadows transform into active lawns and programs evolve to serve the community’s needs.

Phase one of the park comprises the easternmost edge of the master plan, spanning 130 acres. A flexible 5,000-seat amphitheater, designed to host both ticketed events and impromptu performances, is centrally located within the phase. The venue neighbors a community farm barn and ties into the trails network. Three orchards are spaced throughout phase I, on the east and west perimeter, and in the center next to the barn. Active turf fields and rustic meadows follow the arroyo’s meandering path, offering flexible lawns for lounging and activities. SWA collaborated with a team of architects and engineers, including Bickel Group Architecture, to envision and deliver the new amphitheater, scheduled for completion in 2027.

Related Projects

Baton Rouge Lakes

The 275-acre Baton Rouges Lakes system is a series of six lakes in central Baton Rouge adjacent to Louisiana State University, three major parks, and a diverse mix of neighborhoods. Recognizing opportunity in crisis, a newly funded master plan provides sound ecological restoration methods that will heal a dying lake system while reconnecting the region to its ...

Stanford University Terman Park

The removal of an existing building adjacent to the center of Stanford’s campus provided a unique opportunity to fashion an interim park space. The project emphasizes reuse and seeks to utilize salvaged materials as well as the existing grading and fountain as key features of the park. As a multifunctional performance and recreational space, the project ...

Embankment Square

The Embankment Square is located along the east bank of the Huangpu River in Shanghai. The project consists of landscape areas in three office parcels and one waterfront park parcel. The view of the site is remarkable, looking toward the landmark skyscrapers of Lujiazui Financial Center, Nanpu Bridge, the Bund, and the Minsheng CBD.

The design concept c...

Ningbo East New Town Civic Plaza

As an extension of the Ningbo East New Town Government Center, this civic plaza extends the geometry and ecology of SWA’s past work in the city. A central civic axis runs from the government buildings to the Dongqian Lake edge, providing a large, flexible gathering/event space adjacent to an expansive lawn as well as sweeping views of the water. Per city plann...

Bensonhurst Park

Bensonhurst Park is part of the larger Shore Parkway, an 816.1-acre collection of parks that stretches across Brooklyn and Queens. Today, the site provides a series of pathways, passive seating areas, recreational fields and a playground.
SWA/Balsley created a master plan for the redesign of the north end of the park and final design and construction doc...

Shanghai EXPO UBPA (Urban Best Practice Area)

Shanghai EXPO’s Urban Best Practice Area surrounds the Plein Air Museum Park, which chronicles the unique and rich history of the site through objects of art, artifacts, and architecture. The landscape component of the museum park is expressed physically in the form of a Central Park: a gathering space and activity center for the community. The landscape was a...

Ichigaya Forest

“Ichigaya Forest” is the privately owned, publicly accessible, major open space on Dai Nippon Printing Company’s 5.4-hectare new world headquarters in the Shinjuku Ward. Vertical development and production modernization that extends underground was made possible the creation of this 3.2-hectare open space. Over half the site is now planted wi...

Great Park

One of the world’s largest municipal parks, the 1,300-acre Great Park in Irvine, California, is currently under construction with phased openings continuing through 2029. The conceptual framework encompasses redesign and implementation of near- and longer-term uses, with the intent to “put the park back into the park.” The vast site, which was once the Marine ...